VCH - Little Mountain House – Cooling System Upgrades

Furano Pacific Consulting (FPC) led the design and installation management of new heat pumps for Little Mountain House, a healthcare and community care facility. The project required meticulous planning and phased execution to replace failing cooling systems across four Air Handling Units while maintaining operational continuity.

FPC adopted a phased approach, ensuring that the building remained functional and compliant with Infection Prevention and Control standards. The project included upgrading building control systems to prioritize the use of energy-efficient heat pumps over mid-efficiency gas systems, enhancing both sustainability and cost efficiency.

Mechanical System Upgrades:

Design and installation of energy-efficient heat pumps.

Replacement of cooling systems across four Air Handling Units.

Cable Management & Routing:

Conduit design for new mechanical system integration.

Engineering Deliverables:

Mechanical and electrical schematics.


Phased construction plans for minimal disruption.

Power Interconnection Design:

Upgrade of building control systems to optimize energy usage and prioritize heat pump operation.

HVAC Electrical Integration:

Electrical Design for HVAC and heat pump systems to ensure reliable operation.