BEVO Farms - Electrical & Mechanical Systems Restoration
Furano Pacific Consulting (FPC) acted as the Owner's Representative for BEVO Farms, delivering a comprehensive electrical and mechanical restoration plan following a fire incident. The project required rapid assessment, design, and management to ensure a seamless re-establishment of critical greenhouse operations, safeguarding revenue and production.
FPC's scope of work included evaluating the extent of fire damage to the electrical and mechanical systems, executing emergency site response, and leading the design and management of the replacement infrastructure.
This included a new transformer, distribution equipment, 30 MBTU boilers, and Variable Frequency Drives (VFDs) to enhance energy efficiency and performance. Additionally, FPC managed the construction of new office spaces and lunchrooms, optimizing the facility's functionality.
Building Electrical & Mechanical Services:
Design of electrical distribution, transformer replacement, and mechanical system restoration.
Integration of 30 MBTU boilers and VFDs for climate control and energy efficiency.
Cable Management & Routing:
Cable tray and conduit design for effective electrical distribution.
Engineering Deliverables:
Single Line Diagrams (SLDs) for power distribution.
Mechanical piping and control schematics.
Construction management plans for new office and lunchroom spaces.
Power Interconnection Design:
Restoration and re-establishment of power supply to critical greenhouse infrastructure.
Instrumentation & Controls:
Coordination of electrical wiring and control systems for restored greenhouse operations.