top of page
< Back

Arc Flash Studies in Saskatchewan

Furano Pacific Consulting is licensed to practise in Saskatchewan and performs arc flash hazard studies for facilities across the province, including potash and mining infrastructure, agri-processing, institutional and commercial buildings.

The Saskatchewan regulatory basis and our project experience

Electrical safety obligations in Saskatchewan flow from The Saskatchewan Employment Act and the associated occupational health and safety regulations, with CSA Z462 as the referenced practice standard.

There is very little Saskatchewan-specific guidance published on arc flash compliance. The generic material available online is written to American standards and does not reflect the provincial framework.

Saskatchewan project experience

Our Saskatchewan work includes electrical engineering for modular pump houses and a substation at the BHP Jansen potash project — power distribution, controls and utility interconnection for prefabricated E-House and booster pump installations.

That kind of facility is exactly where arc flash work matters most: medium-voltage distribution, modular equipment installed to a schedule, and a workforce that will be opening those enclosures for the next thirty years.

SaskPower, Saskatoon Light and Power, and where we work

Available fault current at your service depends on the supplying utility, and inside the City of Saskatoon that utility is Saskatoon Light and Power — a municipal distributor separate from SaskPower, with its own interconnection guideline and service requirements.

Getting the source data right is not a formality. It sets the fault current the entire study is built on.

Where we work in Saskatchewan

Saskatoon, Regina, Prince Albert, Moose Jaw, Swift Current, Yorkton, North Battleford, Estevan and industrial sites across the province.

Common questions

What does Saskatchewan require? Obligations flow from The Saskatchewan Employment Act and the associated occupational health and safety regulations, with CSA Z462 as the referenced practice standard. The hazard has to be assessed, documented and communicated to the workers exposed to it.

Who can seal the report? A professional engineer registered in Saskatchewan, working under a firm holding an APEGS permit to practise. Furano Pacific Consulting holds an active Saskatchewan licence.

Is my utility SaskPower or Saskatoon Light and Power? If your site is inside the City of Saskatoon, it is Saskatoon Light and Power, which operates its own distribution system and publishes its own interconnection guideline. Everywhere else in the province it is SaskPower. This matters for the source data behind the study as well as for any submission.

Do you travel to remote industrial sites? Yes. Much of our Saskatchewan work is at industrial and processing sites well outside the cities, including modular pump house and substation work at BHP Jansen. Travel is scoped and priced up front.

How long does it take? About two weeks to mobilize after award, and about four weeks from the field visit to the sealed report.

  • LinkedIn

© 2025 by Furano Pacific Consulting Ltd. All rights reserved.

bottom of page